Material used: Tarmac
Background: The original concrete surface was patchy and uneven.
Solution: The team regulated the base to achieve improved levels, then applied a new layer of tarmac.
Features: The work took two days and included full surface preparation. A simple design created a clean, modern look.
Outcome: The result was a smoother, more practical surface that refreshed the appearance of the entranceway.